R2, section Ruskovce – Pravotice, Slovakia
Stage: Detailed Design
Client: HBH Projekt
Investor: Národná diaľničná spoločnosť, SR
Date: II. 2014 – IX. 2016
Technical Specifications:
Implementation of a project with a total of 13 bridges on the section of the R2 expressway built in a half profile as a bypass of Bánovce nad Bebravou. The main object is a seven-span motorway bridge, the superstructure of which consists of pre-stressed prefabricated beams with cast-in-situ concrete slab. The typical span is 31.0 m. The cast-in-situ cross beams above the intermediate supports provide continuity of the structure and are supported on a pair of columns. The bridge is founded on drilled piles.